ANTE User Manual

Create a Project and Plan Tasks

Take a piece of work from nothing to a tracked plan: create the project, bring your team onto it, agree on the stages work moves through, break the job into tasks, and then follow those tasks on a list, a board, or a calendar timeline.

Before you start

You need access to the Projects module. If you can’t see Projects under Workspace in the left sidebar, ask your administrator to grant it.

A project must be attached to a Client. If the client you need doesn’t exist yet you can add it without leaving the create form, so there is nothing to prepare in advance. The person who creates the project automatically becomes its Person In Charge.

Reference pages for the screens used below:

From an empty workspace to a tracked plan
1 / 9

In the left sidebar, open Workspace and click Projects. This is the home of every project you have access to.

Four counters run across the top — Total Projects, Active Projects, Overdue Tasks, and Overall Progress — and the two buttons in the top-right are the ones you need next: Templates opens your saved project templates, and Create Project opens the create form.

Use the view toggle on the right of the search box to switch between List view (a sortable table) and Grid view (cards showing progress, status, person in charge, budget, dates, and task count).

Everything starts from the Projects list.
  1. 1Workspace → Projects in the sidebar
  2. 2Create Project — opens the Create New Project dialog
  3. 3Templates — your saved project setups
  4. 4Switch between List view and Grid view

Where to go next

  • Project Details — the Activity Log, Files, Requirements, Issues Log, Client Pending, Fit-Gap, and Risk Register tabs that sit alongside your views.
  • Project Timeline — how to read the chart, drag bars, and find tasks missing dates.
  • Tasks — the cross-project view of everything assigned to you, with type scopes, status tabs, and filters.
  • Sharing a Project — give a client a passcode-protected link to the project’s live status and timeline.
  • Run Team Meetings — keep the plan moving once the work is under way.